We install underground power cables rated up to 275kV, significantly exceeding the 33kV capability of most competitors in Malaysia. Our work spans medium and high voltage cable laying for utility companies and private infrastructure projects.
Our cable installation services cover the full lifecycle: route planning, trenching or HDD conduit placement, cable pulling, jointing, termination, and testing. We serve TNB, SESB, and private sector clients including data centre operators and industrial developers.

Specialized cable handling equipment for safe, efficient high-voltage installation.
5 units for controlled cable pulling through ducts and trenches. Ensures cable integrity during installation with precise tension control.
5 units for drum handling and cable dispensing. Supports safe unloading and feeding of heavy cable drums at installation sites.
Our key differentiator. Most competitors max out at 33kV. We handle extra-high voltage cable work up to 275kV for major grid infrastructure.
Qualified jointers for underground and overhead cable systems. Straight-through joints, transition joints, and terminations for all voltage classes.
VLF testing, insulation resistance testing, and cable fault location. Every installation is tested before handover to ensure system integrity.
Registered contractor with both peninsular (TNB) and Sabah (SESB) utility companies for cable installation and jointing work.
Selected underground cable projects delivered across Malaysia.
Client: Tenaga Nasional Berhad (TNB)
CableClient: Rentak Segar Sdn Bhd
CableClient: Tenaga Nasional Berhad (TNB)
CableClient: Tenaga Nasional Berhad (TNB)
CableClient: Advancecon Infra Sdn Bhd
Cable